How our projects work
Plain-language guides to what each type of project involves, what we need from you, and what to expect.
Hazardous materials assessments (HBMA)
The different types of assessment (inventory, pre-renovation, pre-demolition, targeted bulk sampling), and destructive versus non-intrusive sampling.
Read the guide →Air monitoring for asbestos and lead work
Background, occupational, area and clearance sampling during asbestos and lead abatement, and what we need from contractors to schedule it.
Read the guide →Hygiene monitoring (workplace exposure assessments)
Measuring worker exposure to silica, chemicals and other workplace hazards, what can trigger it, and the methods used.
Read the guide →Noise monitoring
Measuring workplace noise and worker noise exposure, the action level, environmental noise measurements, and how the results support a hearing conservation program.
Read the guide →Indoor air quality (IAQ) assessments
What we measure, what we need to know about the concern, and why finding nothing can be a useful result.
Read the guide →Safety program development (ECPs, AMPs, SWPs)
How exposure control plans, asbestos management programs, safe work procedures and other safety documents are developed, and what we need from your workplace.
Read the guide →Confined spaces: programs, inventories and hazard assessments
Confined space programs, inventories of the spaces at your workplace, and space-specific hazard assessments, and what we need from you.
Read the guide →Respirator fit-testing
How to prepare your workers for fit-testing (including being clean-shaven where the mask seals), what they need to bring, and what the test involves.
Read the guide →How most projects work
Initial call & site walkthrough
A short conversation about the project and timeline, followed by a site visit or walkthrough where needed, so the proposal fits your project from the start.
Proposal & go-ahead
We'll send you a written proposal setting out the agreed scope, deliverables, timeline, and fees. Work begins once the proposal is accepted, so there are no surprises on either side.
On-site review & sampling
A visual site review, with bulk sampling or air monitoring added where the scope calls for it, following recognized protocols.
Clear report & recommendations
A defensible, plain-language report with the findings and recommendations to help your project meet its regulatory requirements.
Turnaround times are set out in your proposal. Rush turnaround is available on request; a surcharge applies.

Have a question about your project?
Send a short description and we will recommend the right scope.
