Air monitoring for asbestos and lead work

What air monitoring involves when asbestos or lead-containing materials are removed or disturbed, and how to plan around it.

← All guides

When it's needed

This type of air monitoring is used when asbestos or lead-containing materials are removed or disturbed, for example during abatement or renovation. It measures airborne concentrations during the work, to help assess whether controls are working as intended, and is used after asbestos abatement to assess whether an area meets clearance criteria before the enclosure is taken down.

Asbestos

Lead

The number of samples depends on the tasks and the scope of the lead work, and normally includes both area samples near the work and occupational samples worn by workers. Samples are typically collected:

Monitoring for other workplace exposures, such as silica, or products like coatings and adhesives used in construction or manufacturing, is covered in our hygiene monitoring guide.

Types of sampling

Air sampling and site reviews

Air sampling and site reviews are separate services. A site review of containment and work practices, with a written site review record, is included only where it is part of the agreed scope. During air sampling only, any obvious safety concerns we notice are raised with the site supervisor.

What we need from you

How it works

01

Plan the sampling

We agree which tasks, workers and areas to sample, and when.

02

Sampling on site

Samples are collected during the work. A site review is carried out as well where it is part of the scope.

03

Laboratory analysis

Samples are analyzed by accredited laboratories.

04

Results

You receive the results, and a site review record where one is part of the scope.

What you receive

Sample results compared against the applicable limits or clearance criteria. Where a site review is part of the scope, you also receive a site review record with observations and recommendations. Samples are analyzed by accredited laboratories.

Limitations

Quotes and proposals

Quotes are not given verbally over the phone: where practical, we review the site first, then send a written proposal with the scope and deliverables.

Scheduling, cancellations and site readiness

Site visits are booked around your schedule, and our staff travel to site for them, so please let us know as early as possible if the work is delayed or the visit needs to change. Fees for cancellations, rescheduling, no-shows, and waiting time on site (for example, when the work area, access or the people involved are not ready when we arrive) apply as set out in your proposal.

Turnaround

Turnaround times for results and reports are set out in your proposal. Rush turnaround is available on request; a surcharge applies.