Safety program development (ECPs, AMPs, SWPs)

How we develop safety program documents that fit your workplace, and what your part in the process is.

← All guides

What this covers

Confined space programs, inventories and hazard assessments are covered in our confined spaces guide.

When an exposure control plan is needed

Under Part 5 of the BC Occupational Health and Safety Regulation, an ECP is needed where workers are or may be exposed to an air contaminant above its action level, which is half of the exposure limit. Part 5 also identifies designated substances, such as certain cancer-causing substances and reproductive toxins, where exposure must be kept as low as reasonably achievable. Asbestos, lead and crystalline silica are common examples in construction and building maintenance.

Each document is written for your workplace and the work your people actually do, so it can be used on site.

What we need from you

How it works

01

Initial call and document review

We'll talk through your workplace, review what you already have, and confirm with you what is needed.

02

Site visit and task review

We'll observe the work being done and talk with the people who do it, so the documents reflect how the work actually happens.

03

Draft review (where included)

Where a draft review is included in the proposal, you'll receive a draft to review and comment on before the documents are finalized.

04

Final documents

We'll make any agreed revisions and issue the final documents, ready for you to put into use.

What you receive

Final documents in an editable format, ready to put into use. Training on the new documents can be added on request.

Your part, and limitations

Quotes and proposals

Quotes are not given verbally over the phone: where practical, we review the site first, then send a written proposal with the scope and deliverables.

Scheduling, cancellations and site readiness

Site visits are booked around your schedule, and our staff travel to site for them, so please let us know as early as possible if the work is delayed or the visit needs to change. Fees for cancellations, rescheduling, no-shows, and waiting time on site (for example, when the work area, access or the people involved are not ready when we arrive) apply as set out in your proposal.

Turnaround

Turnaround times for results and reports are set out in your proposal. Rush turnaround is available on request; a surcharge applies.

Related guides

Ready to talk about your project?

Send the project details and we will follow up to talk through the plan.

Request a call