Hazardous materials assessments (HBMA)

Which type of assessment fits your project, what we need from you, and what the report can and cannot tell you.

← All guides

Why an assessment is needed

Before renovation or demolition work begins, WorkSafeBC requires that hazardous materials that may be disturbed are identified, so they can be removed or protected before the work starts. Many municipalities also ask for a hazardous materials report before issuing a demolition permit.

An HBMA looks for materials such as asbestos, lead-containing paint, silica-containing materials, mercury (for example in thermostats and fluorescent tubes), PCBs (for example in older light ballasts), and visible mould. Air-conditioning and refrigeration units are reviewed visually. Older buildings are the most likely to contain these materials, but buildings of any age can.

Types of assessment

Asbestos management inventory

An asbestos inventory is prepared to address the requirements of Section 6.4 of the BC Occupational Health and Safety Regulation. It is required for workplaces where workers are present and the building may contain asbestos. The Regulation does not list a single trigger, but the age of the building (e.g. built before 2018) and the potential for workers to be exposed are both considered.

Asbestos inventory reassessment

A follow-up visit to bring an existing inventory up to date. It is mainly a condition assessment, and new samples are not always needed. Materials that have been removed are updated or taken off the inventory when abatement details are provided to us.

Pre-renovation and pre-demolition HBMAs are carried out to address the requirements of Section 20.112 of the BC Occupational Health and Safety Regulation, which calls for hazardous materials to be identified before demolition or renovation work that may disturb them.

Pre-renovation HBMA

Limited to the areas that will be renovated. We need a scope of work and/or construction drawings, and the assessment is tailored to the information provided. The more precisely you can tell us what will be disturbed (walls, ceilings, flooring, mechanical systems), the better the assessment fits the work. Destructive sampling is usually needed within the work area.

Pre-demolition HBMA

Covers the accessible areas of the building and is destructive: walls and ceilings are opened, flooring is lifted, and roofing may be cored. The building is normally vacant. Some areas need extra planning and safety controls before they can be assessed, for example underground or confined spaces, spaces too small to enter safely, areas that can only be reached by demolition, and elevated areas such as pitched roofs (e.g. to sample chimney mastic). These are identified in the proposal.

Targeted bulk sampling

Sampling of one or a few specific materials, for example before a small repair, or when a concealed material is uncovered during renovation or demolition. Results apply only to the materials sampled.

Destructive versus non-intrusive sampling

Non-intrusive sampling covers what can be seen and sampled without opening up or damaging building finishes: for example at the edges of door frames, inside cupboards, or where a material is already damaged. It suits occupied spaces and inventories, but it cannot find concealed materials hidden inside walls, under newer flooring, or above solid ceilings.

Destructive sampling opens up building finishes to find concealed materials. It gives a more representative picture before renovation or demolition, but it leaves damage, so we confirm your permission and the areas involved before starting. Repairs are not included unless agreed in the proposal.

Occupied versus vacant buildings

In an occupied building, the assessment is limited by the safety of the people using it. Sampling is non-intrusive, and we prefer that occupants or tenants are not in the immediate area while samples are collected (for example, not at home during the visit). Because concealed materials cannot be checked, a further assessment is needed before demolition or a significant renovation.

In a vacant building, destructive sampling is possible, so the assessment can cover more.

What we need from you

How it works

01

Initial call, site review and proposal

We talk through the project and confirm which type of assessment fits. Where practical, we review the site first, then send a written proposal with the scope and deliverables.

02

Site assessment and sampling

A room-by-room review of the areas in scope, with bulk samples collected from suspect materials.

03

Laboratory analysis

Samples are sent to accredited laboratories for analysis.

04

Report

You receive the report with findings, photographs, laboratory results and recommendations.

What you receive

A report listing the hazardous materials identified, where they are, their condition and approximate quantities, with photographs, laboratory results, and recommendations for removal or management. The report can be shared with abatement contractors and, where required, with the municipality.

All samples are analyzed by accredited laboratories.

Limitations

Quotes and proposals

Quotes are not given verbally over the phone: where practical, we review the site first, then send a written proposal with the scope and deliverables.

Scheduling, cancellations and site readiness

Site visits are booked around your schedule, and our staff travel to site for them, so please let us know as early as possible if the work is delayed or the visit needs to change. Fees for cancellations, rescheduling, no-shows, and waiting time on site (for example, when the work area, access or the people involved are not ready when we arrive) apply as set out in your proposal.

Turnaround

Turnaround times for results and reports are set out in your proposal. Rush turnaround is available on request; a surcharge applies.